Our solar engineer did a site survey a month before the project was initialized and complete in order to evaluate the energy consumption and solar power needs of the residence.
Taking into consideration the fact that peak consumption for this residence will be during vacation, the solar plant was designed with focus on irradiation data for year round vacation months.